(sorted by date) 

This page allows you to access documents that have been developed in connection with the Turners Falls Hydroelectric Project and Northfield Mountain Pumped Storage Project Relicensing.

Click on Open PDF to view document in pdf format.

You will need Adobe Acrobat Reader to view attachments files on this page.

You can filter this list by choosing criteria from one or more of column headers.

  
All Documents
2012 Documents
2013 Documents
2014 Documents
2015 Documents
2016 Documents
2017 Documents
2018 Documents
PAD References
​ ​
  
  
  
Link to Document
Notification of Intent (NOI) of Firstlight Hydro Generation Company to File an Application for A New License For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485)10/30/2012FirstLight Hydro Generating Company
Pre-Application Document (PAD) For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485)10/30/2012FirstLight Hydro Generating Company
In Stream Flow Study Meeting with Fish Agencies12/13/2012FirstLight Hydro Generating Company
Scoping Document 1 for TransCanada Hydro Northeast Inc. (Wilder Project, Bellows Falls, Vernon Project) and FirstLight (Turner Falls, Northfield Mountain)12/21/2012Federal Energy Regulatory Commission
Filing Of Pre-Application Document (PAD), Commencement Of Pre-Filing Process, And Scoping; Request For Comments On The PAD And Scoping Document, And Identification Of Issues And Associated Study Request12/21/2012Federal Energy Regulatory Commission
Modification to Integrated Licensing Process Schedule12/21/2012FirstLight Hydro Generating Company
Analysis of Erosion in Vicinity of Route 10 Bridge Spanning the Connecticut River prepared by Simons & Associates (2012).1/8/2013FirstLight Hydro Generating Company. 1/8/2013 Filing of Recent Studies Referenced in the PAD.
Riverbank Erosion Comparison along the Connecticut River prepared by Simons & Associates (2012)1/8/2013FirstLight Hydro Generating Company. 1/8/2013 Filing of Recent Studies Referenced in the PAD.
Freshwater Mussel Survey in the Connecticut River for the Turners Falls and Northfield Mountain Hydroelectric Projects prepared by Biodrawversity (2012)1/8/2013FirstLight Hydro Generating Company. 1/8/2013 Filing of Recent Studies Referenced in the PAD.
Aquatic Mesohabitat Assessment and Mapping prepared by FirstLight (2012)1/8/2013FirstLight Hydro Generating Company. 1/8/2013 Filing of Recent Studies Referenced in the PAD.