(sorted by date in descending order) 

This page allows you to access documents that have been developed in connection with the Turners Falls Hydroelectric Project and Northfield Mountain Pumped Storage Project Relicensing.

Click on Open PDF to view document in pdf format.

You will need Adobe Acrobat Reader to view attachments files on this page.

You can filter this list by choosing criteria from one or more of column headers.

  
All Documents
2012 Documents
2013 Documents
2014 Documents
2015 Documents
2016 Documents
2017 Documents
2018 Documents
PAD References
  
  
  
Link to Document
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at Northfield Mountain Project -Second year12/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 2014-2016 Study Report12/1/2016FirstLight Hydro Generating Company
FirstLight Transmittal Letter FERC filing Study Reports 3.3.10 and 3.3.20 12/28/2016FirstLight Hydro Generating Company
FirstLight Discuss Instream Flow Study (FirstLight Study No 3.3.1) Meeting Summary (12/2/2016)12/2/2016FirstLight Hydro Generating Company
FirstLight Notification Letter providing revised FERC filing date for the Relicensing Study Report No. 3.1.2 Northfield Mountain/Turners Falls Operations Impacts on Existing Erosion and Potential Bank Instability Addendum11/18/2016FirstLight Hydro Generating Company
FirstLight Updated Study Report (URS) Study Meeting Summary (10/31/16 - 11/1/2016) 11/15/2016FirstLight Hydro Generating Company
Presentation for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 10/31/2016FirstLight Hydro Generating Company

​​Open PDF

Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area (same report as posted 6/30/16)10/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report (same report as posted 6/30/2016)10/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum - Public Version10/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays Addendum 10/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects Addendum10/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.7 Fish Entrainment and Turbine Passage Mortality Study10/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report 10/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.2. Evaluate Upstream and Downstream Passage of Adult American Shad Study Report10/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station 10/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.1.3 Northfield Mountain Pumped Storage Project Sediment Management Plan10/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volumes I, II, III 10/1/2016FirstLight Hydro Generating Company
FirstLight Transmittal Letter filing 10 Study Reports, 3 Addenda and Agenda for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 10/14/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report 10/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.16 Habitat Suitability Criteria for State-listed Mussel Species in the Connecticut River below Cabot Station Study Report10/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.6.6 Assessment of Effects of Project Operation on Recreation and Land Use 10/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report 9/1/2016FirstLight Hydro Generating Company
FirstLight letter to FERC notifying study reports 3.3.13 and 3.3.15 uploaded to website6/30/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report6/30/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area6/30/2016FirstLight Hydro Generating Company
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report and Meeting Summary5/31/2016FirstLight Hydro Generating Company
Submission of Final License Application and Request for Waiver of Requirement to Include Draft Biological Assessment in Final License Application 4/29/2016FirstLight Hydro Generating Company
Responses to Connecticut River Watershed Council comment letter dated March 25, 2016 and Mr. Karl Meyer comment letter dated March 27, 2016 4/22/2016FirstLight Hydro Generating Company
March 16, 2016, Study Meeting Summary.3/31/2016FirstLight Hydro Generating Company
FirstLight - March 8, 2016 Study 3.3.2 Adult Shad Telemetry Data Analysis Meeting3/8/2016FirstLight Hydro Generating Company
FirstLight- March 16, 2016 Study Report Meeting3/14/2016FirstLight Hydro Generating Company
Filing of Study Reports, Proposed Schedule, and Process Plan for Remaining Study Reports 3/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.12 Evaluation of Emergency Gate and Bypass Flume Discharges3/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River2/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.2.1 Water Quality Monitoring Study3/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays 2/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.11 Fish Assemblage Assessment3/1/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects3/1/2016FirstLight Hydro Generating Company
Revised Study Plan 3.3.19 - Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace2/18/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Pumped Storage Project2/12/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.18 Impacts of the Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms Addendum2/12/2016FirstLight Hydro Generating Company
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment, and Assessment of Operational Impacts on Special-Status Species 2/12/2016FirstLight Hydro Generating Company
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turners Falls Project 2/12/2016FirstLight Hydro Generating Company
Notification of Study Report Meeting, March 16, 20162/12/2016FirstLight Hydro Generating Company
Relicensing Study 3.2.2 Hydraulic Study Addendum2/4/2016FirstLight Hydro Generating Company
Relicensing Study 3.4.1 Baseline Study of Terrestrial Wildlife and Botanical Resources2/4/2016FirstLight Hydro Generating Company
FERC Letter Determination on Requests for Study Modifications and New Studies 1/15/2016Federal Energy Regulatory Commission