Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at Northfield Mountain Project -Second year | 12/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 2014-2016 Study Report | 12/1/2016 | FirstLight Hydro Generating Company | |
FirstLight Transmittal Letter FERC filing Study Reports 3.3.10 and 3.3.20 | 12/28/2016 | FirstLight Hydro Generating Company | |
FirstLight Discuss Instream Flow Study (FirstLight Study No 3.3.1) Meeting Summary (12/2/2016) | 12/2/2016 | FirstLight Hydro Generating Company | |
FirstLight Notification Letter providing revised FERC filing date for the Relicensing Study Report No. 3.1.2 Northfield Mountain/Turners Falls Operations Impacts on Existing Erosion and Potential Bank Instability Addendum | 11/18/2016 | FirstLight Hydro Generating Company | |
FirstLight Updated Study Report (URS) Study Meeting Summary (10/31/16 - 11/1/2016) | 11/15/2016 | FirstLight Hydro Generating Company | |
Presentation for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 | 10/31/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area (same report as posted 6/30/16) | 10/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report (same report as posted 6/30/2016) | 10/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum - Public Version | 10/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays Addendum | 10/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects Addendum | 10/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.7 Fish Entrainment and Turbine Passage Mortality Study | 10/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report | 10/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.2. Evaluate Upstream and Downstream Passage of Adult American Shad Study Report | 10/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station | 10/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.1.3 Northfield Mountain Pumped Storage Project Sediment Management Plan | 10/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volumes I, II, III | 10/1/2016 | FirstLight Hydro Generating Company | |
FirstLight Transmittal Letter filing 10 Study Reports, 3 Addenda and Agenda for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 | 10/14/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report | 10/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.16 Habitat Suitability Criteria for State-listed Mussel Species in the Connecticut River below Cabot Station Study Report | 10/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.6.6 Assessment of Effects of Project Operation on Recreation and Land Use | 10/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report | 9/1/2016 | FirstLight Hydro Generating Company | |
FirstLight letter to FERC notifying study reports 3.3.13 and 3.3.15 uploaded to website | 6/30/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report | 6/30/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area | 6/30/2016 | FirstLight Hydro Generating Company | |
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report and Meeting Summary | 5/31/2016 | FirstLight Hydro Generating Company | |
Submission of Final License Application and Request for Waiver of Requirement to Include Draft Biological Assessment in Final License Application | 4/29/2016 | FirstLight Hydro Generating Company | |
Responses to Connecticut River Watershed Council comment letter dated March 25, 2016 and Mr. Karl Meyer comment letter dated March 27, 2016 | 4/22/2016 | FirstLight Hydro Generating Company | |
March 16, 2016, Study Meeting Summary. | 3/31/2016 | FirstLight Hydro Generating Company | |
FirstLight - March 8, 2016 Study 3.3.2 Adult Shad Telemetry Data Analysis Meeting | 3/8/2016 | FirstLight Hydro Generating Company | |
FirstLight- March 16, 2016 Study Report Meeting | 3/14/2016 | FirstLight Hydro Generating Company | |
Filing of Study Reports, Proposed Schedule, and Process Plan for Remaining Study Reports | 3/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.12 Evaluation of Emergency Gate and Bypass Flume Discharges | 3/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River | 2/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.2.1 Water Quality Monitoring Study | 3/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays | 2/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.11 Fish Assemblage Assessment | 3/1/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects | 3/1/2016 | FirstLight Hydro Generating Company | |
Revised Study Plan 3.3.19 - Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace | 2/18/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Pumped Storage Project | 2/12/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.18 Impacts of the Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms Addendum | 2/12/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment, and Assessment of Operational Impacts on Special-Status Species | 2/12/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turners Falls Project | 2/12/2016 | FirstLight Hydro Generating Company | |
Notification of Study Report Meeting, March 16, 2016 | 2/12/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.2.2 Hydraulic Study Addendum | 2/4/2016 | FirstLight Hydro Generating Company | |
Relicensing Study 3.4.1 Baseline Study of Terrestrial Wildlife and Botanical Resources | 2/4/2016 | FirstLight Hydro Generating Company | |
FERC Letter Determination on Requests for Study Modifications and New Studies | 1/15/2016 | Federal Energy Regulatory Commission | |