This page allows you to access documents that have been developed in connection with the Turners Falls Hydroelectric Project and Northfield Mountain Pumped Storage Project Relicensing.

Click on Open PDF to view document in pdf format.

You will need Adobe Acrobat Reader to view attachments files on this page.

You can filter this list by choosing criteria from one or more of column headers.

  
All Documents
2012 Documents
2013 Documents
2014 Documents
2015 Documents
2016 Documents
2017 Documents
2018 Documents
PAD References
  
  
  
Link to Document
Simons, D.B., Andrew, J.W., Li, R.M., & Alawady, M.A. (1979). Connecticut River Streambank Erosion Study: Massachusetts, New Hampshire, and Vermont. Waltham, MA: US Army Corps of Engineers (USACE).1/1/1979US Army Corps of Engineers
Northrop, Devine and Tarbell, Inc.. 1991. Connecticut River Riverbank Management Master Plan (Draft). Northeast Utilities Service Company, Inc.1/1/1991Northeast Utilities Service Co., Inc.
US Army Corps of Engineers (USACE). 1991. General investigation study - Connecticut River streambank erosion. Waltham, MA: USACE, New England Division.1/1/1991US Army Corps of Engineers
Field Geology Services. (2007). Fluvial geomorphology study of the Turners Falls Pool on the Connecticut River between Turners Falls, MA and Vernon, VT. Prepared for Northfield Mountain Pumped Storage Project. Farmington, ME: Field Geology Services.1/1/2007Field Geology Services
Field, John.  2011. Detailed Analysis of the 2008 Full River Reconnaissance of the Turners Falls Pool on the Connecticut River: Unpublished report prepared for The Landowners and Concerned Citizens for License Compliance.1/1/2011Field Geology Services